Sodium permanganate injection via KAPSDIDS at about 28 gpm using directional nozzles for injection adjacent to the building.
Jaime Allen
Project Manager
EAR is looking for a project manager with experience in managing petroleum and hazardous waste projects. This position involves the management of various types of environmental projects, which can include, but is not limited to site investigations, remedial system installations, remedial injection and excavation, UST removals, operation and maintenance of various types of remedial systems, […]
Geologist
This position involves the collection and compilation of environmental data from sites under different stages or phases of environmental work processes. Under the supervision of a Project Manager or site Foreman, this person will be responsible for completing well-defined tasks including but not limited to the collection of soil, groundwater and air/vapor samples, logging soil […]
Environmental Scientist
This position involves the collection, interpretation and compilation of environmental data from sites under different stages or phases of environmental work processes. Under the supervision of a Project Manager or site Foreman, this person will be responsible for completing well-defined field and office tasks including but not limited to groundwater sampling, collection of soil samples, […]
Environmental Field Technician
This position involves the collection and compilation of environmental data from sites under different stages or phases of environmental work processes. Under the supervision of a Project Manager or site Foreman, this person will be responsible for completing well-defined tasks including but not limited to the collection of soil, groundwater and air/vapor samples, as well […]
American Institute of Professional Geologists Northeast Section Newsletter, Winter 2016 Edition
Check out EAR‘s latest article in the AIPG-NE Newsletter, Winter 2016 Edition, beginning on page 42. Also, take a look at our ad on page 18.
KAPSDIDS application of PetroCleanze™
EAR utilized the Badger Cub Express equipped with a Kinetically Adjustable Pore Space Dilation Injection Delivery System (KAPSDIDS) to deliver a 1,250 gallon mixture of REGENESIS® PetroCleanze™ to the subsurface in a single day. Injecting into a shallow water table is typically a challenge. However, the Badger Cub Express delivered all of the treatment solution […]